E Aquarena Springs Dr Reconstruction

E Aquarena Project Limits

E Aquarena Springs Dr Reconstruction

East Aquarena Springs Drive is classified as a Minor Arterial per the 2018 Transportation Plan with an existing Level of Service (LOS) rating of A. 

A horizontal curve along this roadway is super elevated in the wrong direction and requires reconstruction to improve the safety of the roadway. 

City engineers will also identify drainage issues adjacent to the roadway and analyze the existing cross culverts, storm sewer, ditches and channels. Modifications to the drainage structures will be constructed as needed for the reconstruction of E Aquarena Springs Drive.

Project Schedule

Design Phase Completion: September 2022

Bid Phase Completion: April 2023

Construction Phase Completion: March 2024