About the Project

Project Name: E Hopkins - Pedestrian and Bike Improvements

Project Number: 480

Project Manager: Shaun Condor

Construction Estimate: $1,518,517

Construction Start: 11/2020

Construction completion: Summer 2021

Project Information: 

The project extends along Hopkins Street from CM Allen Parkway to Thorpe Lane. The planned improvements include: Replacing the existing smaller sidewalk with a 10-foot wide multi-use path from CM Allen Parkway to Thorpe Lane; installing a Pedestrian Hybrid Beacon (PHB) crosswalk across Hopkins Street from City Hall to the Public Library; installing a PHB crosswalk across Hopkins Street at Riverside Drive; and adding a turn lane on Charles Austin at Hopkins Street and improving the traffic signal phasing plan.